Client:  Swan Brewery
 Contract details: WATMAR was awarded the task to upgrade of upgrading the swan brewery cooling towers. This included the demolition & waste removal of the existing towers along with design and re-development of the new polyethylene (ABS) piping. The three new units were procured by WATMAR and delivered to site where piping, motors and controllers where installed.
 Time of contract:  2010
 The project outcomes:  All 3 systems where installed and commissioned on time and on budget. The end objective of having specified temperature @ the required flow rates was achieved.
 Approximate project value: $225,000.00.